Under the schedule, 11 camps will be organised in Jaipur mining division between May 25 and 27 for installation in around 400 vehicles.
http://dlvr.it/TSgD5G
Tracking system to be installed in mineral transport trucks

Follow Our Network On LinkedIn: Follow link

Under the schedule, 11 camps will be organised in Jaipur mining division between May 25 and 27 for installation in around 400 vehicles.
http://dlvr.it/TSgD5G